Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

close window
support navigation structure general satellite info ilrs support retroreflector info center of mass site performance info

GIOVE and Galileo

Jump to: Mission Support Status, Current Tracking Statistics, Mission Support Request

ILRS Mission Support Status:

The ILRS Governing Board has approved the Galileo mission support request. Satellite laser ranging data are mainly needed for the validation of the microwave orbit determined from a global tracking network.

The first Galileo in-orbit validation element, GIOVE-A was launched on 28 December 2005. The first orbit and clock characterization campaign started on 22 May 2006 and lasted for eight weeks. For this first campaign, the Galileo project had two GPS+GIOVE sensor stations, one at ESTEC (The Netherlands) and one in Torino (Italy). With such a configuration, the project can only perform a coarse characterization of the on-board clock, because of the limited number stations and because both stations are in Europe. SLR tracking data are essential for "fixing" the orbit so that the clocks can be well synchronized. Additional tracking campaigns will follow. In the interim, the GIOVE tracking priority is comparable to GPS and GLONASS.

Current ILRS Tracking Statistics:

SatelliteSite NameStationStart DateEnd DateNo. PassesNo. Points
GIOVE-AAltay187909-Oct-200916-Oct-20111646
GIOVE-ABeijing724908-Nov-200601-Apr-2009992
GIOVE-ABorowiec781118-May-200718-May-200712
GIOVE-AChangchun723705-Jun-200627-May-20121721,056
GIOVE-AConcepcion740519-Nov-200630-Mar-20121191,020
GIOVE-AGrasse784511-Mar-200909-Jun-2012196733
GIOVE-AGraz783926-Jun-200609-Apr-20122262,100
GIOVE-AGreenbelt710506-Jun-200611-May-2012138465
GIOVE-AHartebeesthoek750126-Jun-200623-May-20122492
GIOVE-AHerstmonceux784011-May-200628-May-2012202885
GIOVE-AKatzively189311-Apr-200719-Jan-20121596
GIOVE-AKiev182415-Mar-201008-Mar-201236
GIOVE-AKoganei730808-Nov-200615-Mar-201251281
GIOVE-A Komsomolsk-Na-Amure186803-Feb-201203-Feb-201213
GIOVE-AMaidanak186423-Jun-200706-Nov-20071298
GIOVE-AMatera794101-Jun-200609-Jun-20122661,144
GIOVE-AMcDonald708027-May-200628-May-2012148578
GIOVE-AMonument Peak711027-May-200615-May-20123391,208
GIOVE-AMount Stromlo782507-Jun-200619-Apr-20121731,336
GIOVE-APotsdam784105-Apr-200928-Mar-2011866
GIOVE-ARiga188424-May-200624-May-200613
GIOVE-ARiyadh783217-Oct-200606-Apr-201044255
GIOVE-ASan Juan740611-May-200631-May-20124873,039
GIOVE-AShanghai782131-Oct-200904-Dec-201132195
GIOVE-ASimeiz187301-Apr-200924-Apr-2009433
GIOVE-ATahiti712413-Jan-201013-Jan-2010110
GIOVE-ATanegashima735812-Feb-200724-Sep-201034171
GIOVE-AWettzell883408-Jun-200626-May-2012144819
GIOVE-AYarragadee709026-May-200627-May-20121,2164,497
GIOVE-AZimmerwald781003-Jun-200630-May-20126316,233
GIOVE-BAltay187918-Sep-200918-Jan-20122682
GIOVE-B Arkhyz188625-May-201124-May-2012927
GIOVE-BBeijing724925-Oct-200804-Oct-2010321
GIOVE-BChangchun723731-May-200819-May-201282366
GIOVE-BConcepcion740512-Oct-200804-Apr-201282603
GIOVE-BGrasse784511-Mar-200909-Jun-2012251956
GIOVE-BGraz783929-May-200824-May-20121721,500
GIOVE-BGreenbelt710529-May-200826-Apr-2012144473
GIOVE-BHartebeesthoek750127-Jul-200908-Jun-201279296
GIOVE-BHerstmonceux784019-Jun-200829-May-2012127524
GIOVE-BKatzively189329-May-200827-Apr-201228190
GIOVE-B Kiev182423-Mar-201123-Mar-201112
GIOVE-BKoganei730807-Aug-200831-Jan-201261344
GIOVE-BMatera794128-Jul-200802-Jun-2012259969
GIOVE-BMcDonald708022-May-200829-Jan-201275283
GIOVE-BMonument Peak711005-Sep-200817-May-2012221662
GIOVE-BMount Stromlo782528-Jul-200808-Jun-201277347
GIOVE-BPotsdam784116-Apr-200919-Aug-2010861
GIOVE-BRiyadh783229-Oct-200808-May-201017106
GIOVE-BSan Juan740620-May-200806-Jun-20123212,128
GIOVE-BShanghai782107-Oct-200918-Dec-201155321
GIOVE-BSimeiz187304-Apr-200925-Sep-2011745
GIOVE-BTahiti712419-Mar-200922-Sep-2010415
GIOVE-BTanegashima735821-Dec-200824-Dec-20102470
GIOVE-BWettzell883422-Jun-200830-May-201289395
GIOVE-BYarragadee709021-May-200830-May-20127953,056
GIOVE-BZimmerwald781021-Jun-200802-Jun-20124865,268
giovea Kiev182408-Mar-201208-Mar-201211

Galileo Mission Support Request Form (August 2004):

Name: Galileo
Prepared by: Javier Benedicto, Galileo Project Manager
Host: European Space Agency, Satellite Manufacturer: Galileo Industries

Primary Technical Contact: Mr Peter Claes
Primary Science Contact: Mr Marco Falcone
Alternate Technical Contact: Mr Manfred Lugert
Alternate Science Contact: ----

Technical Contact Mailing Address: Peter Claes
ESA/ESTEC/APP/NGG, P.O. Box 299
2200 AG Noordwijk, The Netherlands
Science Mailing Address: Marco Falcone
ESA/ESTEC/APP/NG, P.O. Box 299
2200 AG Noordwijk, The Netherlands
Technical Contact Fax: +31 71 565 4369
Science Contact Fax: +31 71 565 4369
Technical Contact E-mail: Peter.Claes@esa.int
Science Contact E-mail: Marco.Falcone@esa.int

Mission objectives: Provide a Galileo Signal in Space, Check out the Space Segment components in the MEO radiation environment, evaluation of the on-board signal generator and the atomic clocks requiring pcise orbit determination for observing the clock.

Mission role: Galileo System Test Bed, GNSS Test Bed for GALILEO (NAVIGATION)

Launch date: October, 2005
Mission duration: 2 years, 3 months
Altitude: 23916 km
Inclination: 56 degrees

Eccentricity: < 0.002
Tracking schedule: to be defined
Spatial coverage: to be defined
Temporal coverage: to be defined
Data accuracy: 1cm (TBC), What is the quality(data accuracy) and quantity of data possible with the provided array size ?

Coordinator: ESA, Galileo Project Office
Priority: high priority, to be discussed.
Data source: GSTB v2/B satellite
POD source: Flight Dynamics System on the OCC as well as Processing
Facilities in the GSTB Processing Centre
Analysis Center: Operational Control Center (OCC) as well as Processing Facilities in the GSTB Processing Centre Npt time span: 30 sec
Tracking requests: Global
Delivery time: no special request, as usual
Array info:
Size (array): 30 cm x 24 cm, planar array, 49 corner cube reflectors, corner cube-size = 28.2 mm, normal to the incidence surface corresponds to nadir pointing of the satellite.

Technical contact for array: Mr Rafael Garcia-Prieto
Array contact number: 00-31-71-56 5 4474
Array contact email: Rafael.Garcia.Prieto@esa.int

Comments: What is the quality and quantity of data possible with the provided array size ?