
GIOVE and Galileo
Jump to: Mission Support Status, Current Tracking Statistics, Mission Support Request
ILRS Mission Support Status:
The ILRS Governing Board has approved the Galileo mission support request. Satellite laser ranging data are mainly needed for the validation of the microwave orbit determined from a global tracking network.
The first Galileo in-orbit validation element, GIOVE-A was launched on 28 December 2005. The first orbit and clock characterization campaign started on 22 May 2006 and lasted for eight weeks. For this first campaign, the Galileo project had two GPS+GIOVE sensor stations, one at ESTEC (The Netherlands) and one in Torino (Italy). With such a configuration, the project can only perform a coarse characterization of the on-board clock, because of the limited number stations and because both stations are in Europe. SLR tracking data are essential for "fixing" the orbit so that the clocks can be well synchronized. Additional tracking campaigns will follow. In the interim, the GIOVE tracking priority is comparable to GPS and GLONASS.
Current ILRS Tracking Statistics:
Satellite | Site Name | Station | Start Date | End Date | No. Passes | No. Points |
---|---|---|---|---|---|---|
GIOVE-A | Altay | 1879 | 09-Oct-2009 | 16-Oct-2011 | 16 | 46 |
GIOVE-A | Beijing | 7249 | 08-Nov-2006 | 01-Apr-2009 | 9 | 92 |
GIOVE-A | Borowiec | 7811 | 18-May-2007 | 18-May-2007 | 1 | 2 |
GIOVE-A | Changchun | 7237 | 05-Jun-2006 | 27-May-2012 | 172 | 1,056 |
GIOVE-A | Concepcion | 7405 | 19-Nov-2006 | 30-Mar-2012 | 119 | 1,020 |
GIOVE-A | Grasse | 7845 | 11-Mar-2009 | 09-Jun-2012 | 196 | 733 |
GIOVE-A | Graz | 7839 | 26-Jun-2006 | 09-Apr-2012 | 226 | 2,100 |
GIOVE-A | Greenbelt | 7105 | 06-Jun-2006 | 11-May-2012 | 138 | 465 |
GIOVE-A | Hartebeesthoek | 7501 | 26-Jun-2006 | 23-May-2012 | 24 | 92 |
GIOVE-A | Herstmonceux | 7840 | 11-May-2006 | 28-May-2012 | 202 | 885 |
GIOVE-A | Katzively | 1893 | 11-Apr-2007 | 19-Jan-2012 | 15 | 96 |
GIOVE-A | Kiev | 1824 | 15-Mar-2010 | 08-Mar-2012 | 3 | 6 |
GIOVE-A | Koganei | 7308 | 08-Nov-2006 | 15-Mar-2012 | 51 | 281 |
GIOVE-A | Komsomolsk-Na-Amure | 1868 | 03-Feb-2012 | 03-Feb-2012 | 1 | 3 |
GIOVE-A | Maidanak | 1864 | 23-Jun-2007 | 06-Nov-2007 | 12 | 98 |
GIOVE-A | Matera | 7941 | 01-Jun-2006 | 09-Jun-2012 | 266 | 1,144 |
GIOVE-A | McDonald | 7080 | 27-May-2006 | 28-May-2012 | 148 | 578 |
GIOVE-A | Monument Peak | 7110 | 27-May-2006 | 15-May-2012 | 339 | 1,208 |
GIOVE-A | Mount Stromlo | 7825 | 07-Jun-2006 | 19-Apr-2012 | 173 | 1,336 |
GIOVE-A | Potsdam | 7841 | 05-Apr-2009 | 28-Mar-2011 | 8 | 66 |
GIOVE-A | Riga | 1884 | 24-May-2006 | 24-May-2006 | 1 | 3 |
GIOVE-A | Riyadh | 7832 | 17-Oct-2006 | 06-Apr-2010 | 44 | 255 |
GIOVE-A | San Juan | 7406 | 11-May-2006 | 31-May-2012 | 487 | 3,039 |
GIOVE-A | Shanghai | 7821 | 31-Oct-2009 | 04-Dec-2011 | 32 | 195 |
GIOVE-A | Simeiz | 1873 | 01-Apr-2009 | 24-Apr-2009 | 4 | 33 |
GIOVE-A | Tahiti | 7124 | 13-Jan-2010 | 13-Jan-2010 | 1 | 10 |
GIOVE-A | Tanegashima | 7358 | 12-Feb-2007 | 24-Sep-2010 | 34 | 171 |
GIOVE-A | Wettzell | 8834 | 08-Jun-2006 | 26-May-2012 | 144 | 819 |
GIOVE-A | Yarragadee | 7090 | 26-May-2006 | 27-May-2012 | 1,216 | 4,497 |
GIOVE-A | Zimmerwald | 7810 | 03-Jun-2006 | 30-May-2012 | 631 | 6,233 |
GIOVE-B | Altay | 1879 | 18-Sep-2009 | 18-Jan-2012 | 26 | 82 |
GIOVE-B | Arkhyz | 1886 | 25-May-2011 | 24-May-2012 | 9 | 27 |
GIOVE-B | Beijing | 7249 | 25-Oct-2008 | 04-Oct-2010 | 3 | 21 |
GIOVE-B | Changchun | 7237 | 31-May-2008 | 19-May-2012 | 82 | 366 |
GIOVE-B | Concepcion | 7405 | 12-Oct-2008 | 04-Apr-2012 | 82 | 603 |
GIOVE-B | Grasse | 7845 | 11-Mar-2009 | 09-Jun-2012 | 251 | 956 |
GIOVE-B | Graz | 7839 | 29-May-2008 | 24-May-2012 | 172 | 1,500 |
GIOVE-B | Greenbelt | 7105 | 29-May-2008 | 26-Apr-2012 | 144 | 473 |
GIOVE-B | Hartebeesthoek | 7501 | 27-Jul-2009 | 08-Jun-2012 | 79 | 296 |
GIOVE-B | Herstmonceux | 7840 | 19-Jun-2008 | 29-May-2012 | 127 | 524 |
GIOVE-B | Katzively | 1893 | 29-May-2008 | 27-Apr-2012 | 28 | 190 |
GIOVE-B | Kiev | 1824 | 23-Mar-2011 | 23-Mar-2011 | 1 | 2 |
GIOVE-B | Koganei | 7308 | 07-Aug-2008 | 31-Jan-2012 | 61 | 344 |
GIOVE-B | Matera | 7941 | 28-Jul-2008 | 02-Jun-2012 | 259 | 969 |
GIOVE-B | McDonald | 7080 | 22-May-2008 | 29-Jan-2012 | 75 | 283 |
GIOVE-B | Monument Peak | 7110 | 05-Sep-2008 | 17-May-2012 | 221 | 662 |
GIOVE-B | Mount Stromlo | 7825 | 28-Jul-2008 | 08-Jun-2012 | 77 | 347 |
GIOVE-B | Potsdam | 7841 | 16-Apr-2009 | 19-Aug-2010 | 8 | 61 |
GIOVE-B | Riyadh | 7832 | 29-Oct-2008 | 08-May-2010 | 17 | 106 |
GIOVE-B | San Juan | 7406 | 20-May-2008 | 06-Jun-2012 | 321 | 2,128 |
GIOVE-B | Shanghai | 7821 | 07-Oct-2009 | 18-Dec-2011 | 55 | 321 |
GIOVE-B | Simeiz | 1873 | 04-Apr-2009 | 25-Sep-2011 | 7 | 45 |
GIOVE-B | Tahiti | 7124 | 19-Mar-2009 | 22-Sep-2010 | 4 | 15 |
GIOVE-B | Tanegashima | 7358 | 21-Dec-2008 | 24-Dec-2010 | 24 | 70 |
GIOVE-B | Wettzell | 8834 | 22-Jun-2008 | 30-May-2012 | 89 | 395 |
GIOVE-B | Yarragadee | 7090 | 21-May-2008 | 30-May-2012 | 795 | 3,056 |
GIOVE-B | Zimmerwald | 7810 | 21-Jun-2008 | 02-Jun-2012 | 486 | 5,268 |
giovea | Kiev | 1824 | 08-Mar-2012 | 08-Mar-2012 | 1 | 1 |
Galileo Mission Support Request Form (August 2004):
Name: Galileo
Prepared by: Javier Benedicto, Galileo Project Manager
Host: European Space Agency, Satellite Manufacturer: Galileo Industries
Primary Technical Contact: Mr Peter Claes
Primary Science Contact: Mr Marco Falcone
Alternate Technical Contact: Mr Manfred Lugert
Alternate Science Contact: ----
Technical Contact Mailing Address: Peter Claes
ESA/ESTEC/APP/NGG, P.O. Box 299
2200 AG Noordwijk, The Netherlands
Science Mailing Address: Marco Falcone
ESA/ESTEC/APP/NG, P.O. Box 299
2200 AG Noordwijk, The Netherlands
Technical Contact Fax: +31 71 565 4369
Science Contact Fax: +31 71 565 4369
Technical Contact E-mail: Peter.Claes@esa.int
Science Contact E-mail: Marco.Falcone@esa.int
Mission objectives: Provide a Galileo Signal in Space, Check out the Space Segment components in the MEO radiation environment, evaluation of the on-board signal generator and the atomic clocks requiring pcise orbit determination for observing the clock.
Mission role: Galileo System Test Bed, GNSS Test Bed for GALILEO (NAVIGATION)
Launch date: October, 2005
Mission duration: 2 years, 3 months
Altitude: 23916 km
Inclination: 56 degrees
Eccentricity: < 0.002
Tracking schedule: to be defined
Spatial coverage: to be defined
Temporal coverage: to be defined
Data accuracy: 1cm (TBC), What is the quality(data accuracy) and
quantity of data possible with the provided array size ?
Coordinator: ESA, Galileo Project Office
Priority: high priority, to be discussed.
Data source: GSTB v2/B satellite
POD source: Flight Dynamics System on the OCC as well as Processing
Facilities in the GSTB Processing Centre
Analysis Center: Operational Control Center (OCC) as well as
Processing Facilities in the GSTB Processing Centre
Npt time span: 30 sec
Tracking requests: Global
Delivery time: no special request, as usual
Array info:
Size (array): 30 cm x 24 cm, planar array, 49 corner cube reflectors,
corner cube-size = 28.2 mm, normal to the incidence surface corresponds
to nadir pointing of the satellite.
Technical contact for array: Mr Rafael Garcia-Prieto
Array contact number: 00-31-71-56 5 4474
Array contact email: Rafael.Garcia.Prieto@esa.int
Comments: What is the quality and quantity of data possible with the provided array size ?